5.26.2010

a recent advertorial

So we recently decided to break a few rules of advertising in a timber porn magazine. It came from how I've been feeling recently as the industry struggles with the balance between craft and what it takes to make a living.

"It's Not About the Marketing
"For most of our 25 years as a timber frame company, New Energy Works has been blessed with a talented marketing staff. The job of sharing just who we are can be challenging, and these folks help us express this with fine graphics, a strong presence on the Internet, and even a hip logo. It’s all good stuff.

"But at a recent home show, a timber frame company owner was telling me that he had fired most of his staff, and was pretty happy just having all his timber framing sourced, cut, and raised by subcontractors. “After all,” he reasoned, “it’s really just about the marketing.”

"His words stunned me.

"By expressing structure as craft and combining that with extraordinary energy efficiency and a caring business environment, timber framing has rocketed to the forefront of residential construction. This couldn’t have happened without sawdust in our blood and dirt under our fingernails.

"When a New Energy Works frame goes up, it does so by the same joiners who worked on it in the shop, with the support of their coworkers who have helped design and engineer it, and often in conjunction with other coworkers who will enclose it, even be responsible for the home’s completion.

"There are questions you can ask your timber framer to gain a thorough understanding of the timber framing process. Although there are no completely right or wrong answers, a picture will evolve that will help you find a timber frame company for your needs.

• Do you do your own timber framing (e.g. engineering, cutting, finishing, raising)? If not, why not?
• Do you use the most modern and safe equipment, as well as employ fine handwork, when needed?
• Do you offer dry and stable timbers (both reclaimed and properly dried) so the joinery stays tight?
• What are your sanding and finishing options?
• Do your own crews raise the frame, no matter where it is?
• What about specialty enclosure options and installation?
• How long have your key people been with you? Are they involved in the timber frame community, including the guild and business council, continually learning as well as serving?

"Our homes represent an extraordinary effort among a complex and experienced team to deliver an expression of our life’s work. Our clients often come to know us as individuals, and appreciate the effort we’ve made on their behalf. While there may not be perfectly correct answers to all your questions, one thing is absolute:

"Timber framing is not about the marketing."

The image above is from our handraising of Chris and Susi Carlberg's new wine tasting room at Christopher Bridge Winery in Oregon City. A favorite photo.

5.07.2010

springing back

We just had our one year anniversary of the timber frame raising here at the Vermont Street Project. Started digging in March, raised the frame in May, worked through the summer of 106 degree days and a fall of finishing details, moved in the week before Christmas... then slept. For the last 4 months we've slept, at least in this journaling world.

But last week we opened our eyes to find the ecoroof ready to be installed on the studio, and knew it was time to stand up, arch the back in a slow, body-yawn type of motion like the cat-post-nap, and git back at 'er. Thanks for checking back once in a while. Thank you Silke, Jennifer, even you Josh for the gentle reminders. Thanks for the kind interest. Perhaps I'm back. I do, not surprisingly, have a great deal to say.The studio isn't complete, except for the exterior, but when it is it will be my Portland work place and a one bedroom apartment you could stay at... for a short time! Unlike the main house, which has a metal roof and is designed to catch rainwater in a sistern for drinking, bathing et al, the studio has a pretty flat pitch. We wanted to play a bit with timbers and post modernism. This gave us the opportunity to place dirt and plants up there. Ecoroof, green roof, living roof. All the same thing and there's ecological benefit. Not a ton, but some.

In a heavy urban setting, plants on top can help mitigate the heat-island created by too much concrete, asphalt and rubber in one place. Chicago comes to mind as a city that has embraced this effort. I don't live in a heavy urban setting. Here's my list of value for this roof:
1) Initial storm surges from hard rains tend to overload the storm water runoff in our city. The soils and plantings can be one small part of lessening this by holdng on to some of this water for a bit. 2) Of lesser value, the plantings will actually help the roof lengthen its life, thereby requiring less material overtime. This is done simply by blocking the ultraviolet and harsh sun.And we enjoyed the process. here's Maxine painting with sedums. We used five varieties of sedum cuttings, which I will be happy to supply you upon request. They were distributed in a lightweight soil mixture of basalt, compost and humus. All I had for structure was about 15lbs/sq.ft available for the saturated soil weight, so we went pretty shallow, just under 3 inches deep. This made us put in a simple irrigation system with a moisture sensor, for those few times in summer when even sedum would die.


1.17.2010

holiday

It's quiet here in my common room on Vermont Street, the living room part of our new home that is open to kitchen and eating areas. Jake is off playing at Devon's, who has digital games. (Jake recently informed Maxine and me with great frustration that he is the last child in America without any digital games or direct TV. He'll live.) The rain on our metal roof is the steady and quiet white noise of today's background, adding to an atmosphere of rest. The wood stove pops and sends out a warm embrace.Maxine says I sprained my back on Mt. Hood yesterday in part because it was so clear that I could use a day or two just being. Just being on the couch. Ice has become my good friend all day. I realize it's been 3 weeks from my last post, and the "remember me" function on the host page doesn't remember me. I'm thinking it is just being snarfy. Now would be a good time for catching up a tad.A great nagging concern during the construction of this home was that when completed, it would not meet my standards. In our career at New Energy Works Timber Frame Homes, we've done fine work. We've been blessed with great clients, and they've expressed their thanks and their enjoyment of the home. But I simply did not know what to expect upon moving into one of our works, deep inside.

I am blown away by what we have created, of what we do as a company.

My irrationally high bar has been reached. Maxine agrees. ( Jake too, although he wishes it was closer to Devon.) Maxine has been saying that she feels like she is house sitting for someone very special, and that soon they are coming home, and we will be asked to leave. In late evening I sit and gaze at the sculpture in which we live and watch shadows, space and tone.

The house welcomed us and our family for our Christmas gathering. Sure there were packing boxes about, and we certainly didn't know how to work everything. People cut you a lot of slack in moments like this. The new space shone through the chaos.Now the holiday season ends. We're back to work finishing a thousand details and the studio next door. Maxine cooks fresh pirogies for the gang and Val sees his chance to deconstruct the ginger bread house, leaving only teeth marks.

12.23.2009

move in

I had said for many months that we would be in for the holidays. By golly we made it, with help from a shoe horn and some olive oil. Activity and its buddy exhaustion reached a peak. Noel the clay plasterer scrubbed walls one last time, Maxine scrubbed shower tile for the first time, we vacuumed until late each night and fought for a temporary certificate of occupancy.
The plastic foams we'd been saving got loaded in Michael's van. We were able to recycle the expanded polystyrene (think coffee cup stuff,) that is too often used for packaging. Various hard plastics for strapping etc. also got recycled.
I was surprised that we couldn't recycle the #7 polyisocyanurate (above) that Hubbardton Forge uses for its packaging, unless we wanted to transport it to Hayword, California. REALLY disappointed, and am writing them a letter. I understand their need to protect the glass shades. How about this wild serrated corrogated cardboard that came with the stove from Scandanavia? Michael came to a great solution, though: he'll going to break it up into small pieces and throw it into his attic for additional r-value.
Friday was moving day. We lifted and carried and loaded and drove. Three trips for the 24' U-Haul, plus our vehicles. My calves are still burning. A bunch of boxes that hadn't been opened in 18 months.
It's very hard to describe the feeling I have occupying this home. As things get put away and we can find our wallets, our socks and our senses, drawer pulls get installed, the lighting gets programmed... I accept it all with wonder. Perhaps with the most excitement, we get a tree and light the stove.
...and pose for a group picture with the crew. From left is Hobart, Michael, Jake River, Maxine, me, David and Val. Quite an effort, quite a team.
Dexter and Annie Brown express their own levels of comfort.

There's still much to do, and we'll push on both with our hammers and this journal. Next up is a breakdown of the home systems and methods, furniture design, the completion of the studio, and my own once-again changing role.

For this weekend, we'll rest (and ski!) Maxine's mom Irene is here helping, Dean and brother Paul are on their way. Sierra and Sheila (who ALMOST didn't get through O'Hare last night) are coming, some friends and neighbors are stopping by. There's a gingerbread house to bake. From all of us here at The Vermont Street Project, from New Energy Works Timber Frame Homes and Pioneer Millworks, Have a Merry Christmas, a Happy Hanukah, and a Great New Year.

12.16.2009

2009, a house odyssey

It's 10pm, and I'm getting in from the site a bit late again. Dragging less than I would have thought. We're into the last few days before move-in, and this is about fun and spark. Val and Michael stayed on until past 7, and we had some burritos and beer, chatted through the world's problems, but mostly just wound down. Then I got some private time to just doodle in the quiet space. This is that magical time when so little, relatively, is left to do and the house is about to be launched from project status on toward becoming a home. Our home.

Do you remember the Velveteen Rabbit, by Margery Williams? A stuffed rabbit has to be loved to become real. (Really, you've got to read this.) Gets tattered and worn along the way, but eventually becomes real, because it is truly loved. The Vermont Street Project is stepping into its own velveteen journey now. Time to become a home, old friend. Plan to get worn along the way.

Tonight I dallied a bit in the dusky empty spaces... doing stuff. You know, good and necessary stuff, like some more cleaning, and putting second coats of oil on a couple of floors, and painting the pipes of the Rais wood stove a proper gray, and finishing installing Hal. Hal is the refrigerator. He doesn't move around much without help, but he's quite a bit smarter than me, and there's a lot to him. There's so much to him that Val suggested that we might want to get him his own Facebook page. No I mean it. Last night Val and I and Justin the plumber spent hours with Hal. (I should note that earlier, a good many of us had about broken our backs getting Hal off my old Ford '78 pick up, up the walk and in through the front door. To give you an idea how heavy he is, 3 people spontaneously burst out laughing at the appliance place when they set in into my truck bed and the springs shot from smile to frown in excited immediacy.) Once in place, we had to give him water, electricity, hook up his hard drive with antenna so he could... I dunno what, communicate? It took a few minutes but when we found the hidden "On" button the insides look like a well-lit runway and the LED controls were clearly calling out to us.Then we wiggled this and adjusted that. And then we wiggled this some more and adjusted that QUITE a bit more. This dance went on for a while, but with both satisfaction and growing anticipation we could tell the battle was going our way. He's tight into his niche now, comfortable and secured. I just need to figure out what he's trying to say to me.

Hal is a Miele 36" single door with bottom freezer. model #KF1901SF. This is an amazingly well made appliance; German company, made in Turkey. Almost all of our appliances are Miele, and most made in Germany. BASCO, our supplier in Portland, has been extraordinary to work with, and has a showroom that will make you weep.



12.14.2009

is it too much?

I look at the health care debate from a practical angle, as a business owner. In doing so, I can skip past the part where the conversation would lead me to ask, incredulously, "Why would anyone not want others to have this?" I have numerous friends and acquaintances I respect with whom I would differ on this topic, philosophically. We are wired differently.

What I simply don't get is why the entire business community, other than the medical insurance lobby, obviously, isn't DEMANDING a rational argument and a national health plan. One that would offer an option for a public policy that would be a viable and regulated alternative to the system right now.

The medical industry represents 15% of our GNP. The next nearest industrialized country spends about 6%. How can I compete with that? If it is simply logical that my co-workers and staff need to be healthy, and that therefore I need to supply them with the funds to buy health insurance, and this insurance is rising by many multiples of the cost of living, then it would seem the system is broken, and by looking at systems that aren't (the German, the Swedish, even the French, for God's sake,) we could possible learn something.

I've been blessed with some great staff and subcontractors at the Vermont Street Project. I'm dismayed by how many are not covered by health insurance. It's a bad way to run a country. And now it looks like the public option, first weakened to a level of insipidness, is now off the table entirely. Score another for big insurance.

12.06.2009

hardscape

The temperature has just dropped to well under freezing here in the pacific northwest. It's possible that my luck has run out in my effort to get the majority of concrete placed before spring. That said, we've had a great last two weeks of reasonable weather, and we've poured:
  • 100ft of 4' tall retaining wall, which is most of it
  • The front stoop
  • The studio porch floor
  • The grilling and dining patios
  • A small section of parking area
The above were given a slight broom finish, but basically smooth.
We also poured the entire length of center spine squares of exposed aggregate-finished concrete squares, about 150' long statement that unites fron to back, and defines the space between the main home and studio/garage.
Very psyched. I'm also a bit surprised by my reaction to getting these exterior hardscape elements completed. exterior site finishing and landscape architecture are perhaps my weakest area, in terms of hands-on experience and design confidence. Now that we've added this skillset to New Energy Works Timber Frame Homes with the addition of Don Naetzker, who brings a wealth of planning and landscape design experience into our community, it's a new set of opportunities and interest.

I'm not sure I was ready for how this work has suddenly defined our home as both welcoming and livable. We have a sidewalk sort of thing now, not mud and gravel. It brings me to my home. It says we are almost there.

12.01.2009

on my knees

With some of our floors, there's nothing like a penetrating oil like Land Ark to bring out the depth of color, grain and ultimate character. two examples are our Settler's Plank, which is a recycled hardwood from the jackets, or outsides, of industrial or agricultural timbers, or weathered boards. the uneven and patina'd nature of this material really calls for a vigorous rubbing in of oil.

We also like to use oils on Douglas-fir, as in this vertical grain Forest Stewardship Council (FSC) certified floor in the tower. The early and late woods in the grain jump right out. Since the wood is quite soft anyway, it would imply that this room is a shoes-off area. It would also imply that we need to be ready to renew the oiled finish perhaps twice a year. With oil, this simply means rubbing in more. No sanding. etc, as long as you're not trying to make the natural dents and surface mars from your 8 year old Jedi warrior go away, and good luck with that!

11.27.2009

a bar too high?

For my entire life I have been plagued by the haunting notion that I should be doing a better job. Certainly I'm not alone in this, as without it, we'd lack a great majority of the forward push that so describes the human condition. And CERTAINLY I have NO interest in trying to delve into figuring out why: at least not here, in front of YOU, for gosh sakes! (Many years ago at a particularly low life-spot, at my one and only effort to get professional counseling, the guy with the degree was really bummed when I said, Sure, we can talk about anything, except... well...and by the end of that list of we're-not-going-there's he was looking pretty forlorn. Hey, let it lie, wouldja, there are homes to build!)

We're human, and we're often driven. I'm okay with that. Some of that drive makes us work harder to do better things. Progress, and evolution. The downside for some of us is that there is little peace, not much real deep level rest.

Val and I are already writing a list of things here at The Vermont Street Project we could do better... next time. Thankfully, these seem to be mostly procedural. I'm praying hard that few of these gotchas get translated in finished product. Some things would be easy to fix, like the wrong mirror in the bathroom or the door swing in the library. The other end of the spectrum holds nightmares like bad bathroom usage/design (see comment at end of post*) or the wrong cross-linked polyethelene pipe in the radiant slab (see#3) below.) So far so good, and relief that it is coming together so well is morphing into a sense of awe at our new home.We've been told by a bunch of clients over the years that after living in the finished house for a while they can't really find anything they'd change, or that it "fits us like a glove and how did you do that?" The tough side of me has wanted to discount the compliment, thinking that they're just not trying hard enough or perhaps have rationalized their way into this love-trance. The angel on the other shoulder whispers softly to let it all come in, baby, because that's how it's SUPPOSED to feel after all this work.

While I'll let you know if it fits us like a glove in a year or so, I do know that I screwed up on:

1) Financing. Next time I would be more arduous and act more quickly in setting up a permanent solution. While resolved, the extra time and headaches caused other problems.
2) Decisions. A few more would have been tackled earlier, even if I don't think it humanly possible at the time. Some of these include: outside hardscapes and final grading; exactly what interior wall section will be eventually covered by tile, panelling, built-ins, etc., so we're not scraping off expensive and thoughtfully applied clay plaster; and who would fill some of the subcontractor roles sooner than the day before they are needed.
3) Heating contractor. Just because the heating system is mostly piping (boiler, radiators, etc.) doesn't mean the otherwise very good plumbing company should do this scope.
4) Get the heating system installed and functional much earlier... see #s 1) and 3) above. We're now bringing the interior temperature up to normal, and seeing some movement in the wood floor that will cause some extra work.Oh there will be others, and this is, in retrospect, a rather sissy list. Here's what I wouldn't pretend that I could have done differently: Be set with a vast percentage more of decisions at the outset. Yup, would have been easier to build. Yet it would not have been the dynamic, knowledge based opportunistic and cohesive result. Design is a process, not a product, remember?

And we're only human, remember?

* Postcript on our bathroom. The main house has a powder room, a lower level full bath, for guests, mostly, and one main bath. Our son may have a killer bedroom occupying the full tower level with the best view of all, but Maxine and I are pretty convinced that making it easy for our paths to cross as a family, in the bathroom, is okay. With a nod toward some privacy, we've sectioned off the toilet and shower from the vanity and soaking tub. So Jake will have to traipse downstairs and join his family in his adolescent years, by design. Ask me in a year about this particular glove.

11.22.2009

what is going on.here

I didn't envision this journal to be a well-organized day by day accounting. I'm not a well organized guy. But to be fair to you, here's what is going on with just 4... er, i mean 3... weeks to move in. Yikes.

On Monday Sam of Evolution Floors starts sanding the elm, by next Saturday we'll have all the finishes on. Dan of West Side Electric is working hard with help from Gary the lighting designer on the install of the crazy electric program. Justin of MP Plumbing has just about got the boiler system complete, and still has a little hair left after a fair amount of head scratching. He'll move onto the finish plumbing fixtures next week. Greg from Imagine Energy installed the solar hot water panels, storage tank, pumps and controls, and now Jonathan Cohen will come and commision the system. I'm not thinking we'll be totally ducky first try. I AM thinking this is the coolest mechanical system I know.As soon as the floors are done Alex and Jesus return to finish off the tile, including the main shower, the bathroom counter, the woodstove platform, the entry slate from Sheldon Slate and an astounding amount of glass tile from Oceanside on a variety of backsplashes. Their product is very pricey and hard to install, but used thoughtfully, its impact has the reach and economy as the shaft from a laser beam. Our Rais woodstove is in at Ecohaus and will be installed as soon as the grout dries.

David and Michael have been finishing the tower floor install (FSC douglas-fir) and various main floor trim details prior to cleaning out in time for the finishers. They start on the studio exterior next week, as there can be almost no one inside the main house while the floor finishes are applied. Hobart is at his home shop building medicine cabinets, mudroom cubbies, pantry shelving and counters, and the dining room banquette. We've just picked our fabric colors for Corby at Hexafoo to order for the bench upholstery and new seats for some Salvation Army-found chairs that we're stripping and staining. (Our table gets shipped from NEWwoodworks next week. Makes me want to shout!)
Outside we've just poured the footers for 100' of retaining wall and the front stoop, and start forming the walls themselves on Monday. While we won't get the complete driveway in this year, we're aiming for as many of the exteriors stoops, steps, and slabs as possible. The mud is relentless and it's not like we're going to see it dry out until June. The flat torch-down roof on the studio is just about done, and we'll even look to apply the root barrier and get some medium up there for the sedum. The Jeldwen windows are being delivered on Tuesday.On Maxine's and my dance card is the many last details of fit and finish, plus moving hard into furniture sourcing, and in some cases, design and fabrication. Maybe we'll do the rent-a-couch for holidays? We're also the designated cleaners, sweepers, oilers, painters and go-fers. Today Maxine painted more radiators; I built a walkway across the compost/mulch/straw/mud yard, using old pallettes and wood scraps, and spent two hours flattening cardboard boxes and seperating packaging foams into recyclable plastic sorts. It's work I enjoy.The last week or so will be packing up our rental home, punchlisting all we can, including a big showing by Noel and Josh to touch up the American Clay, and negotiating with The City That Works, to get us a temporary certificate of occupancy. Work will continue after occupancy, our lives will be different.

11.15.2009

coloring in the picture

We can see Mt. Hood from our rental house here in the valley on a sunny day. But as it hasn't been sunny lately it has been hidden. If it's chilly and raining in Portland, it's likely to be snowing on the mountain. With the ski blogs buzzing, it didn't take much more than Val's text yesterday afternoon, "Hot damn, some fluffy powder and not many people. Epic comes to mind," for Jake and me to gain altitude and break into another season. 54 inches deep at mid mountain, and a moist but pleasant texture boosted our early confidence. Our friends Chris and Heather gave Jake some really nice outgrown skis and I finally bought myself a helmet. A good day of turns, and I'm sore now. We dragged ourselves home and snuggled onto the sectional in front of a kid's movie. The day off was great, thanks, and needed.

Recently Maxine and I were mourning the simple truth that we didn't have the luxury to immerse in and dwell on and celebrate the process of building our dream home. There are still and always so many choices and decisions pending. The banks and these challenging economic times have made finances tense. Our lease is running out and perhaps more importantly our desire to stay any longer in this rental house. To move in as planned just prior to Christmas means the concrete guy and site guy and about 14 other players and stars have to line up just the way they...will, by golly. We know we won't be complete, but will we be far enough along for our needed certificate of occupancy?

All of this will simply make us better at what we do as builders and as designers. I also believe that to a large extent, it shouldn't be too easy, because we are making huge decisions that utilize resources, affect our families and communities, and as designers and builders and yes owners we should be challenging ourselves with each project to do better not only than the drivel that generally passes for today's new homes but better than whatever we did on our last project, in our last month, in our latest thinking.

Perhaps like birthing, where I've heard more than one woman talk about how a combination of faded memory and the grace of parenthood are important antidotes to the reality of just how dang hard giving birth really is, we're at the building stage that could make me forget just how hard and long the road has been. Maxine calls it "coloring in the picture." We are now seeing rooms whose naked volumes once offered great promise begin to deliver on that very promise. The hues of slate and clay plaster bounce off of the stainless sink and land firmly and well-balanced on the oak island top. Rich walnut cabinetry dances with the elm floor first with a lively gait as the south windows pull in full light, and then more slowly, but with feeling, as that light wanes into the west.

It's also a time of large and small battles. Our bath counter broke, and as is too common in these cases, both the fabricator and the manufacturer point at the other. Do we do this at Pioneer Millworks? Lord I hope not. The counter would have been a good-looking new product called Trinity, made from recycled glass and concrete. We're not going to buy another slab, though, so a good solution is to use the same porcelain tile as the floor. It'll be fine, frankly, though I put this in the "not a win, really" category.In the "we'll definitely take this as a little win" group was finding out that in some circumstances we can drill more holes in porcelain sinks that get delivered with the wrong number of holes. This is David using a diamond-abrasive hole saw":
A home like this is made up of thousands of these skirmishes. They work out. This is the guest bath, in the basement near the ping pong table, with the new sink and its correct number of holes.